Projects

Parking SystemProject – NSW Health – CAME Gard4 Boom Gate System. Dual access with newly constructed traffic island with hidden cabling. Standalone access control, automatic free exit, PE safety beams, bollard protection and separated pedestrian access and crossing.

Parking System ProjectProject – NCYC Commercial Centre – CAME Gard4 Boom Gate System with BPT Intercom. Single boom gate used for entry and exit. 24/7day timer for weekend free parking, PE safety beams, bollard protection and intercom boom gate open function for 10 corporate offices.

Automatic Sliding SecurityProject – Medical Centre – 4m automatic sliding security gate with PE safety beams, automatic loop exit and access control, pedestrian access gate, 4m double swing leaf gates and perimeter security fencing, HD CCTV, Alarm & Access Control Systems. Location – Wollongong NSW.

Project – ALDI Stores – Installation of Heavy Duty Steel Core Drilled Below In-ground Bollards For Anti Ram Raid Application. Tabacconist – Wollongong NSW.

Stainless Steel Bollard InstallationProject – Sydney International Airport – Core Drill Stainless Steel Bollards installed to prevent airport luggage trolleys from entering the rail system.

Urbaco Automatic Bollards SydneyProject – NSW Government – Sydney CBD – Urbaco Automatic Rising Bollard System – Pneumatic Cylinder overhaul.

CAME Gard4 Boom Gate Installation Stage 1Project – Sydney Town Hall – Stage 1 – Installation of Boom Gate System for dock safety, Manual control Panel, PE safety beam, bollard protection and associated line marking.

Sydney Olympic Park Security BollardsProject – Sydney Olympic Park – Installation of freestanding removable key lockable security bollards using new concrete sleeves with 100mm bitumen finish.

CAME Gard4 Boom GateProject – Sydney Town Hall – Stage 2 – Installation of Boom Gate System for dock safety, Manual control Panel, PE safety beam, bollard protection and associated line marking.

Project- Medical Centre – 3.8m Double Swing Security Gates. Location – Wollongong NSW.

CAME Ati Swing GateProject – GPT Group – Fabrication and installation of automatic commercial security gate, PE safety beams, 600lb magnetic gate lock, radio interface with remote controls.

One way road spikesProject – Hertz Canberra Airport – Installation of One Way Road Spikes for hire car storage facility.

Car Park Fit OutProject – Parramatta Leagues Club – Car park fit out. Wheel stops, speed humps and bollards.

BSL90 Security Bollard InstallationProject – Hertz Sydney NSW – Installation of freestanding BSL90 Sleeve Lok removable security bollards.

Project – Westfield Liverpool – Installation of car park products including wheels stops, speed humps, bollards and line marking.

Long Range WiFi CCTV SystemProject – Mossvale Rural – Installation of long range WIFI CCTV system. CCTV is transmitted via numerous access points at different locations from 500m to 3km without the need for expensive cabling or trenching.

Project – Wollongong NSW – Chain Gate Barrier System – Installation of chain gate barrier with programmable access control system, automatic free exit & PE safety beams.

Project – Commercial Client – Upgrade to CAME Bk1800 sliding gate operator with radio interface and remote controls & PE safety beams.

High Security KelryanProject – Commercial Premise – Sydney NSW – Installation of 316 grade stainless steel freestanding removable key lockable anti ram raid bollards.

Guardrail Installation Fox Studios AustraliaProject – Fox Studios Australia – Sydney NSW – Installation of RMS Guardrail along car park cliff face for vehicle and driver safety.

Security Bollard Installation For Sydney TrainsProject – Sydney Trains – Installation of high level security bollards across the Sydney railway network to prevent vehicular access to critical sections of the railway corridor.

CAME Gard8 Installation Project – Mine Site NSW – Installation of a stainless steel CAME Gard8 Boom Gate System, PE Safety Beams, Automatic Exit, LED Traffic Lights, Motorola Two Way Intercom System, Flashing Boom Arm, Keypad, Radio Interface with remotes & Programmable Access Control.

Bollard Installation around electrical substationProject – Integral Energy – Sydney NSW – Installation of below in ground bollards to protect an electrical substation.

Car Park Fit OutProject – Burwood Library – Sydney NSW – Installation of wheel stops, guardrail, bollards and line marking.

Installation of traffic safety mirrorsProject – Kmart DC – Sydney NSW – Installation of traffic safety mirrors to each side of every roller door access ways for forklift and pedestrian safety.

Project – TAFE NSW – Installation of speed humps to reduce traffic speeds within a shared vehicle and pedestrian area.

Sydney Town Hall Lord Mayors EntranceProject – Sydney Town Hall – Lord Mayors Entrance – Remedial works included removal or existing stair cases and asphalt new section of driveway.

CAME Turnstile InstallationProject – Illawarra Fly Treetop Walk – Installation of a quality CAME stainless steel turnstiles to control pedestrian access.

Wbeam Guardrail InstallationProject – Food Processing Plant Sydney NSW – Installation of W-Beam Guardrail as a safety measure to separate forklifts and pedestrians.

Wbeam Installation Shoalhaven HeadsProject – Shoalhaven Heads NSW – Installation of W-Beam Guardrail to protect pedestrians and shop fronts from vehicles.

Anti Slip Installation ProjectProject – Marine Rescue NSW – Installation of anti-slip products to stair cases and floor areas to increase pedestrian foot holdings and reduce slip risks on metal stair cases and emergency ladders.

Green Square Pedestrian Seperation ProjectProject – Green Square Train Station – Installation of stainless steel removable NEATA post and rail system to separate incoming and outgoing foot traffic using the escalators.

Sydney Cricket Ground BollardsProject – Sydney Cricket Ground – Installation of surface mount bollards to separate service vehicles and pedestrians in the basement area.

Maintenance of automatic security bollardsProject – Sydney CBD – Service and maintenance of automatic retractable security bollards.

Griffith Height Bar Installation

Project – Custom Truck Height Bar Installation for Food Processing Plant Central NSW.

Guardrail Installation

Project – Guardrail Type (D) Installation for Pedestrian & Forklift Separation – Major Australian Transport Distribution Centre – Eastern Creek NSW

Project – Ball Fence Installation for Pedestrian Separation – Major Australian Construction Company – Huntingwood NSW.